About CL3 Data Center
OVERVIEW
CL3 is a facility operated by Equinix in the Calgary market. The facility boasts a total of 177,500 SF and offers customers access to office space, conference rooms and break rooms. Connectivity to Console Connect and Google Cloud is available for customer use. UPS systems are configured in N+1 redundancy with N+1/2N generators and N+1 cooling.


FACILITY INFO
POWER
??? NN
Commissioned Power
??? NN
Available Power
??? NN
Under Construction Power
??? NN
Planned Power
-
Estimated Power Cost$0.080 - 0.100
-
Single or Dual FeedSingle Feed
-
On-Site SubstationNo
-
Power ProviderEnmax
-
Number of SubstationsOne
-
Estimated kW/Cabinet5.00 - 5.00
-
Additional Information--
BUILDING
??? ??
Commissioned Space
??? ??
Available Space
??? ??
Under Construction Space
??? ??
Planned Space
-
StatusOperational
-
Building Size177500 SF
-
Year Built1998
-
Building Floors1
-
Building OwnerEquinix
-
Purpose Built or RetrofitRetrofit
-
On-Site Office SpaceYes
-
On-Site Conf RoomYes
-
On-Site Break RoomYes
GET A QUOTE
No Obligation. Free. Privacy Guaranteed.
Cabinet Requirements
Additional Options
Redundant power feed
Three-phase power
Committed Bandwidth*
Please enter the committed bandwidth amount
Burstable Bandwidth
{{ errors.first('burstableBandwidth') }}
Contact Information
CONNECTIVITY
CONNECTIVITY
-
Bell Canada56 Fiber
-
Console Connect81 Cloud
-
Google Cloud196 Cloud
-
MTS Allstream26 Fiber
-
Shaw Business18 Fiber
-
Sprint173 Fiber
-
TELUS Communications59 Fiber
-
Zayo913 Fiber
INFRASTRUCTURE
INFRASTRUCTURE
-
UPS RedundancyN+1
-
UPS DescriptionA/B/C UPS configuration
-
Generator RedundancyN+1/2N
-
Generator DescriptionOne local utility 25kV feed; C531 – 1.8MVA power capacity; C532 – 1.0MVA power capacity; C534 – 1.0MVA power capacity; C531 – three (3) 2 MW generators; C532, C532, C533, C534 – two (2) 2MW generators configured for 2N; branch circuit metering to cabinet viewable by the customer via CP; 24”x42” cabinets with 2x 208VAC/20A 3-phase PDUs
-
Cooling RedundancyN+1
-
Cooling DescriptionC531 – 880 tons of cooling capacity using a closed loop glycol cooling system; C532 – 630 tons of cooling capacity using a direct expansion air cooled system; C533 & C534 – both 372 tons of cooling capacity using an indirect evaporative system
COMPLIANCE
- SSAE-16
- SSAE-18
- HIPAA
- PCI
- DIACAP
- Energy Star
- ISO
- FISMA
- FEDRAMP
- NIST
- SOC 1
- SOC 2
- SOC 3
- Uptime Institute MO Site Award
- Uptime Institute Tier III Constructed
- Uptime Institute Tier III Design
SERVICES
- Private Suites
- Dedicated Infrastructure
- Cloud
- SLA 99.9%
SECURITY
- Perimeter Fencing
- Card Key Access
- CCTV
- Man Trap
NEARBY FACILITIES
We found 7 facilities near 5300 86th Avenue in Calgary, Alberta.
BACK TO PROFILE
REQUEST A QUOTE FROM Equinix CL3 FACILITY
Tell us a little about your needs before we connect you with a Equinix representative.
Looking for a colocation data center?
Look no further! We have a complete list of available data centers in the market you desire. Search and order your colocation space in 4 easy steps.
ColoNOW
Dismiss