x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Equinix

74 West Street; 1st Floor

Waltham, MA

BO1

COLOCATION

About BO1 Data Center

OVERVIEW


Equinix's BO1 data center is located at 74 West Street; 1st Floor in Waltham. The data center is a 21,909 SF retrofit facility. BO1 currently offers fiber connectivity to GTT (Global Telecom & Technology), IX Reach and tw telecom. On the infrastructure side, the facility offers N+1 redundancy for UPS, N+1 for cooling, and N+1 for generators.

4Q22 Boston Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Single Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    2.40 - 4.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    21909 SF
  • Year Built
    1972
  • Building Floors
    1
  • Building Owner
    Atlantic Management
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (14) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    3 (three) 225 kVA and 2 (two) 500 kVA parallel redundant feeds
  • Generator Redundancy
    N+1
  • Generator Description
    3 (three) 750 kW diesel generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    320 tons Evaporative Cooling Refrigeration System

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Equinix BO1 FACILITY

Tell us a little about your needs before we connect you with a Equinix representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Equinix.

SEND QUOTE

GET A QUOTE