x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Equinix

818 W 7th Street; 6th Floor

Los Angeles, CA

LA2

COLOCATION

About LA2 Data Center

OVERVIEW


Equinix operates this data center located at 818 W 7th Street; 6th Floor in the Los Angeles market. The facility boasts a total of 405,768 SF and offers customers access to office space, break rooms and conference rooms. Cloud services from PacketFabric, Microsoft Azure ExpressRoute and AWS Direct Connect are available at the facility. The UPS systems are 2N redundant and the generators are N+1 redundant.

1Q23 Los Angeles Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.110 - 0.110
  • Single or Dual Feed
    Single
  • On-Site Substation
    Yes
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    2.40
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    405768 SF
  • Year Built
    1925
  • Building Floors
    12
  • Building Owner
    Downtown Properties
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (5) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • Generator Redundancy
    N+1
  • Generator Description
    Two (2) 1,250 kW diesel generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    Air-cooled chillers and CRAC units; granular temperature controls & hot/cold aisle containment; renewable energy - 100% wind renewable energy certificates in 2016

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Equinix LA2 FACILITY

Tell us a little about your needs before we connect you with a Equinix representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Equinix.

SEND QUOTE

GET A QUOTE