x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

eStruxture

149 High Plains Place

Rocky View County, AB

CAL-2

COLOCATION

About CAL-2 Data Center

OVERVIEW


eStruxture has announced plans to bring additional capacity to the market with a new facility in Rocky View County. The purpose built facility will finish out with a total footprint of 92,839 SF and is expected to eventually offer over 4,000 kW of critical power. The data center is designed to feature N+1/2N UPS redundancy. The data center is designed to meet ISO, PCI and SOC 2 standards.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Single Feed
  • On-Site Substation
    No
  • Power Provider
    Fortis
  • Number of Substations
    One
  • Estimated kW/Cabinet
    30.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Planned
  • Building Size
    92839 SF
  • Year Built
    --
  • Building Floors
    1
  • Building Owner
    --
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider PoPs Services
  • Data coming soon.

INFRASTRUCTURE


  • UPS Redundancy
    N+1/2N
  • Generator Redundancy
    2N
  • Generator Description
    Minimum of 24 hours of on site fuel storage at full load; diverse fueling contractor arrangements; ability to increase the 24-hour fuel storage option
  • Cooling Redundancy
    N+1
  • Cooling Description
    Each data hall is serviced by mechanical corridors; supply air is fed through a raised floor plenum; custom solutions available upon request; varies based on densities; hall level and individual cabinet level cooling solutions available; high-density cooling available

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM eStruxture CAL-2 FACILITY

Tell us a little about your needs before we connect you with a eStruxture representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to eStruxture.

SEND QUOTE

GET A QUOTE