x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

eStruxture

800 Rue du Square-Victoria

Montréal, QC

MTL-1

COLOCATION

About MTL-1 Data Center

OVERVIEW


eStruxture's MTL-1 Data Center is conveniently located in Montreal’s city center, easily accessible via both public and private transportation. The facility includes more than 25,000 square feet of colocation space and is served by a dual-feed power substation operated by Hydro Quebec, with a total capacity of 5MW. All major carriers are on-site and high-density power and cooling are available standard.

2Q22 Montreal Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Hydro Quebec
  • Number of Substations
    One
  • Estimated kW/Cabinet
    30.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    984397 SF
  • Year Built
    1964
  • Building Floors
    47
  • Building Owner
    Groupe Mach
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    No
  • On-Site Break Room
    No

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (19) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1/2N
  • UPS Description
    Concurrently maintainable 1 MW UPS architecture; flexible 2N solution available upon request
  • Generator Redundancy
    N/2N
  • Generator Description
    2 MW dedicated generator; multiple generators; on-site diesel storage providing 22 hours unrefueled operation
  • Cooling Redundancy
    N+1
  • Cooling Description
    Chilled water in use throughout the facility; hot aisle/cold aisle containment; customized containment pods; zone monitoring to ensure environmental conditions; emergency refueling contracts in place

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM eStruxture MTL-1 FACILITY

Tell us a little about your needs before we connect you with a eStruxture representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to eStruxture.

SEND QUOTE

GET A QUOTE