x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

GI Partners

624 S. Grand Avenue

Los Angeles, CA

COLOCATION

About GI Partners Data Center

OVERVIEW


GI Partners is growing and plans to build out this data center in Los Angeles. The data center is expected to be sized at 664,248 SF and could have as much as 6,000 kW critical power. Designs for the facility feature N/N+1/2N UPS redundancy. We expect cloud services like AWS Direct Connect and fiber providers like Dynamic Network Services, TeliaIX and Clear Wireless to have a presence in the building.

2Q21 Los Angeles Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Yes
  • Power Provider
    LADWP
  • Number of Substations
    One
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Planned
  • Building Size
    664248 SF
  • Year Built
    1967
  • Building Floors
    31
  • Building Owner
    GI Partners
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (146) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N/N+1/2N
  • Generator Redundancy
    N+1
  • Generator Description
    Ten (10) existing 2 MW generators with additional designed twelve (12) 3 MW generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    Cold and hot-aisle containment; 4,400 ton central condenser water plant

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM GI Partners FACILITY

Tell us a little about your needs before we connect you with a GI Partners representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to GI Partners.

SEND QUOTE

GET A QUOTE