x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

LightEdge

8020 Arco Corporate Drive, Suite 310

Raleigh, NC

RTP 1

COLOCATION

About RTP 1 Data Center

OVERVIEW


LightEdge operates this facility in the Raleigh-Durham data center market. The 95,176 SF retrofit facility provides colocation services to a variety of customers. Cooling systems are configured in N+1 redundancy.

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    --
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    30.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    95176 SF
  • Year Built
    --
  • Building Floors
    4
  • Building Owner
    --
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    --
  • On-Site Conf Room
    --
  • On-Site Break Room
    --

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (2) PoPs Services
  • Centurylink
    625 Fiber
  • Level 3
    745 Fiber

INFRASTRUCTURE


  • UPS Redundancy
    2N
  • UPS Description
    Redundant isolated path power architecture; always-on double conversion UPS systems
  • Generator Redundancy
    --
  • Generator Description
    Priority refueling contracts for continuous generator operation during emergencies; 1.5 MW diesel generators
  • Cooling Redundancy
    N+1
  • Cooling Description
    HVAC system; controlled temperature and humidity via building management systems; full cold aisle containment

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM LightEdge RTP 1 FACILITY

Tell us a little about your needs before we connect you with a LightEdge representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to LightEdge.

SEND QUOTE

GET A QUOTE