Milton Keynes is a colocation data center in Linford Wood operated by Pulsant. This retrofit facility measures 45,000 square feet in total. Infrastructure in the data center includes 2N+1 UPS and N+1 generator redundancies, with a cooling configuration of N+1.

1Q23 London Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    Yes
  • Power Provider
    --
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    45000 SF
  • Year Built
    --
  • Building Floors
    1
  • Building Owner
    Pulsant
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider PoPs Services
  • Data coming soon.

INFRASTRUCTURE


  • UPS Redundancy
    2N+1
  • UPS Description
    Total UPS provision 4MVA (3,200kW) across site
  • Generator Redundancy
    N+1
  • Generator Description
    3 x MTU/FG Wilson 1,500kVA Standby Rated units
  • Cooling Redundancy
    N+1
  • Cooling Description
    Chilled Water Cooling and DX redundant cooling solutions to 2,500kW

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Pulsant Milton Keynes FACILITY

Tell us a little about your needs before we connect you with a Pulsant representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Pulsant.

SEND QUOTE

GET A QUOTE