x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Pulsant

Unit 1, 35 Imperial Way

South London

COLOCATION

About South London Data Center

OVERVIEW


This Pulsant facility is positioned at Unit 1, 35 Imperial Way in Croydon. The building comes in at 28,000 in total SF and currently offers 2,500 kW of critical power. Backup generators are configured as N+1.

1Q23 London Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    28000 SF
  • Year Built
    2007
  • Building Floors
    2
  • Building Owner
    Pulsant
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider PoPs Services
  • Data coming soon.

INFRASTRUCTURE


  • UPS Redundancy
    2N+1
  • UPS Description
    Blended Emerson and MGE Galaxy units with up to 30 minutes autonomy
  • Generator Redundancy
    N+1
  • Generator Description
    2 x FG Wilson 2,250 kVA Prime Rated units
  • Cooling Redundancy
    N+1
  • Cooling Description
    Blended Fresh Air technologies and Variable DX redundant cooling solutions to 1,400kW

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Pulsant South London FACILITY

Tell us a little about your needs before we connect you with a Pulsant representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Pulsant.

SEND QUOTE

GET A QUOTE