x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

Switch

660 Greens Parkway

Houston, TX

Houston 2

COLOCATION

About Houston 2 Data Center

OVERVIEW


Houston 2 is a colocation data center in Houston operated by Switch. The facility boasts a total of 350,000 SF and offers customers access to office space, break rooms and conference rooms. Carrier options at the data center include AT&T, Cogent Communications and Alpheus. To ensure continuity of service, the facility maintains N+1 generator redundancy.

4Q22 Houston Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    $0.070 - 0.070
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    --
  • Number of Substations
    --
  • Estimated kW/Cabinet
    50.00
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    350000 SF
  • Year Built
    2015
  • Building Floors
    --
  • Building Owner
    Switch
  • Purpose Built or Retrofit
    Purpose Built
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (16) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    1500 kW Powerware 9395 lineups per power train
  • Generator Redundancy
    N+1
  • Generator Description
    Scalable 2.25 MW Cummins diesel generators; 7,600 gallons, 48 hours of fuel per generator
  • Cooling Redundancy
    N+1
  • Cooling Description
    Chilled Water Cooling Systems

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM Switch Houston 2 FACILITY

Tell us a little about your needs before we connect you with a Switch representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to Switch.

SEND QUOTE

GET A QUOTE