x
This website uses cookies to improve your experience. By continuing to use this website, you consent to their use. Learn more

T5 Data Centers

1001 Third Avenue South

Minneapolis, MN

T5@Minneapolis

COLOCATION

About T5@Minneapolis Data Center

OVERVIEW


Extremely safe location with low occurrence of man-made or natural hazards. Available cloud on ramps to major providers including Megaport. An additional 67 providers can be brought to the property via existing dark fiber. Fully remodeled lobby, conference room, tenant lounge, UPS and customizable data halls.

4Q22 Minneapolis Data Center Market Report

POWER


??? NN

Commissioned Power

??? NN

Available Power

Login to view capacity data

??? NN

Under Construction Power

??? NN

Planned Power

  • Estimated Power Cost
    --
  • Single or Dual Feed
    Dual Feed
  • On-Site Substation
    No
  • Power Provider
    Xcel Energy
  • Number of Substations
    Two
  • Estimated kW/Cabinet
    --
  • Additional Information
    --

BUILDING


??? ??

Commissioned Space

??? ??

Available Space

Login to view capacity data

??? ??

Under Construction Space

??? ??

Planned Space

  • Status
    Operational
  • Building Size
    47000 SF
  • Year Built
    1988
  • Building Floors
    8
  • Building Owner
    Legacy Investing
  • Purpose Built or Retrofit
    Retrofit
  • On-Site Office Space
    Yes
  • On-Site Conf Room
    Yes
  • On-Site Break Room
    Yes

GET A QUOTE

No Obligation. Free. Privacy Guaranteed.

Cabinet Requirements

Additional Options

Redundant power feed

Three-phase power


Committed Bandwidth*

Committed or "flat-rate" bandwidth is an unmetered connection where you can use any amount up to the limit for the same price every month.

Please enter the committed bandwidth amount

Burstable Bandwidth

Burstable or "fractional commit" is where you pay for a certain amount of bandwidth, but can utilize additional bandwidth as needed during times of peak demand. Additional charges will apply for utilizing bandwidth above the base level. E.g. "100 Mbps w/40Mbps Committed" or "20 Mbps burstable to 1000 Mbps"

{{ errors.first('burstableBandwidth') }}

Contact Information

CONNECTIVITY


Provider (10) PoPs Services

INFRASTRUCTURE


  • UPS Redundancy
    N+1
  • UPS Description
    (8) 720kW UPS (planned expansion to 16 x 720kW)
  • Generator Redundancy
    N+1
  • Generator Description
    (5) 1500 kW Cummins generators; (4) 1535 kW Cat generators; 60,000 gallon on-site fuel storage
  • Cooling Redundancy
    N+1
  • Cooling Description
    (4) 600-ton cooling towers; (2) chiller plants; (4) 600-ton Trane chillers; (1) 350-ton Trane chiller; 2,950 tons of chilled water cooling capaccity

COMPLIANCE


  • --

    SSAE-16
  • --

    SSAE-18
  • --

    HIPAA
  • --

    PCI
  • --

    DIACAP
  • --

    Energy Star
  • --

    ISO
  • --

    FISMA
  • --

    FEDRAMP
  • --

    NIST
  • --

    SOC 1
  • --

    SOC 2
  • --

    SOC 3
  • --

    Uptime Institute MO Site Award
  • --

    Uptime Institute Tier III Constructed
  • --

    Uptime Institute Tier III Design

SERVICES


  • --

    Private Suites
  • --

    Dedicated Infrastructure
  • --

    Cloud
  • SLA 99.9%

SECURITY


  • --

    Perimeter Fencing
  • --

    Card Key Access
  • --

    CCTV
  • --

    Man Trap
Clear All

BACK TO PROFILE

REQUEST A QUOTE FROM T5 Data Centers T5@Minneapolis FACILITY

Tell us a little about your needs before we connect you with a T5 Data Centers representative.

DATA CENTER REQUIREMENTS


BASIC INFORMATION


By clicking send, I agree that datacenterHawk will send this information to T5 Data Centers.

SEND QUOTE

GET A QUOTE